On a scorching day in July 2025, in the workshop of Henan Blue Sky New Environmental Protection Engineering Technology Co., Ltd., a tense and orderly equipment installation work is in full swing.
The quality control personnel patrol back and forth in the workshop, strictly monitoring the installation quality of each process. They use professional measuring tools such as levels and theodolites to measure key parameters such as the levelness and verticality of the equipment, ensuring that the installation accuracy meets the design requirements. Once any quality issues are found, they immediately require the installation workers to rectify them.
It is believed that with everyone's joint efforts, the new equipment will surely be put into operation smoothly, creating more value for the company in the field of environmental engineering.
2025-07-25
2025-07-19
2024-10-16
2025-07-18
2025-03-27
2025-05-15